HOA Vitals Join the waitlist

Blog · Guide · Nov 10, 2026

Florida SIRS and milestone inspections: what condo buyers should check

Florida condo buildings three habitable stories or taller need a structural integrity reserve study and, from age 30, a milestone inspection. What each one is, what the seller must give you, and what to look for.

If the Florida condo you're buying is in a building three habitable stories or taller, two documents say the most about the big repair bills ahead. The milestone inspection report answers whether the structure is sound. The structural integrity reserve study, or SIRS, answers whether there's a plan, and money, to keep it that way. The seller has to give you the first one's summary, once the building has had its inspection, and a copy of the second. The law gives you seven days with them before you're locked in.

Which buildings these rules cover

Both apply to buildings three habitable stories or taller, as the Florida Building Code counts them. Buildings of one to four homes with three or fewer habitable stories above ground are exempt. A two-story condo won't have either document. That doesn't mean it has no big repairs coming: ask for its reserve study instead.

The two documents side by side

The milestone inspection

A licensed architect or engineer inspects the building's load-bearing elements and its primary structural members, and reports on the safety and adequacy of the structure. It comes in two phases.

  • Phase one is a visual examination of the building. If the inspector finds no substantial structural deterioration, the inspection ends there.
  • Phase two is required when phase one finds substantial structural deterioration. It can include testing that opens up parts of the building.

"Substantial structural deterioration" means distress or weakness that harms the building's general structural condition and integrity. Surface cracks and peeling finishes don't count, unless the inspector finds they're a sign of it.

Within 45 days of getting the report, the association has to send the inspector's summary to every owner and post it on the property. If the association is required to have a website, the full report goes there too. Repairs for substantial structural deterioration have to be started within 365 days of the phase two report.

The structural integrity reserve study

The SIRS is a reserve study for a set list of the building's parts, based on a visual inspection:

  • the roof;
  • the structure, including the load-bearing walls and other primary structural members;
  • fireproofing and fire protection systems;
  • plumbing;
  • electrical systems;
  • waterproofing and exterior painting;
  • windows and exterior doors;
  • any other item that costs more than $25,000 to replace or to catch up on its maintenance, when its failure would harm the items above. The state adjusts that amount for inflation each year.

For each item, the study gives its remaining useful life, what replacing it or catching up on its maintenance will cost, and a schedule for funding it. Associations that existed on July 1, 2022 had to complete their first study by December 31, 2025, or by December 31, 2026 at the latest when it was done together with a milestone inspection due by then. Within 45 days of receiving a study, the association has to give each owner a copy or a notice that it's available.

What the law says about the money

  • The owners can't vote these reserves away. For budgets adopted from December 31, 2024, the owners can't vote to skip or cut the reserves for the items in the SIRS, with a few narrow exceptions.
  • The law sets a floor, not a target. At a minimum, the study has to include a baseline funding plan, which keeps the reserve balance above zero each year. A building can follow the law and still have little cushion.
  • Reserves don't have to come from dues alone. They can be funded by regular assessments or, with a majority vote of all the voting interests, by special assessments, loans or lines of credit.
  • A temporary pause is allowed. For budgets adopted through December 31, 2028, an association that completed a milestone inspection in the previous two calendar years can pause or reduce its reserve contributions for up to two budgets in a row, to pay for the repairs the inspection recommended. That takes a majority vote of all the voting interests, and a new SIRS before the contributions start again.

When the reserves fall short of a repair, the owners pay the difference. How to tell if a special assessment is coming.

What the seller has to give you

In a resale, the seller has to give you these, at the seller's expense:

  • the declaration, the articles of incorporation, the bylaws and the rules;
  • the association's annual financial statement and annual budget;
  • the inspector's summary of the milestone inspection report, where the building has had one;
  • the most recent SIRS, or a statement that the association hasn't completed one;
  • the turnover inspection report, if one was done on or after July 1, 2023;
  • the association's "Frequently Asked Questions and Answers" sheet;
  • the state's form that summarizes how condo associations are governed.

Unless you had the documents for more than seven days before you signed, the contract has to let you cancel within seven days of signing it and receiving them. Saturdays, Sundays and legal holidays don't count. A waiver of that right has no effect, and the right ends at closing.

The contract itself has to tell you where the building stands. For contracts signed after December 31, 2024, it must say in conspicuous type if the association is required to have a milestone inspection or a SIRS and hasn't completed it, or that the association isn't required to have one.

What to look for

  1. Are both documents done? If the seller gives you a statement that there's no SIRS, ask the association why, and when it's due. For older associations the deadline was December 31, 2025, or December 31, 2026 at the latest. The law also lets an association put a required study off for up to two budget years after a milestone inspection, so it can pay for that inspection's repairs first.
  2. In the milestone summary: did phase one find substantial structural deterioration? Was a phase two needed? Which repairs does it recommend, have they started, and how are they being paid for?
  3. In the SIRS: which items have only a few years left, and what will they cost? Is the funding schedule a baseline plan, which only keeps the balance above zero?
  4. In the budget: does this year's reserve contribution follow the SIRS schedule? Is a pause in effect?
  5. In the financial statement: the actual reserve balance, and any loan or line of credit used to fund the reserves, which has to be disclosed there.
  6. What's outside the SIRS list. The study covers a set list. Paving, pools and other shared parts may sit outside it, so check that the budget reserves for them too.

For the numbers inside the study, see how to read an HOA reserve study and what's a good percent funded.

Why lenders care

Fannie Mae treats a condo project that needs critical repairs as ineligible. Its examples include a building that has failed a mandatory inspection tied to structural safety, and one with unfunded repairs of more than $10,000 per unit that should be done within 12 months. If a structural or mechanical inspection was completed in the last three years, the lender has to get the report and review it. More on what lenders check in a building.

Questions to ask the HOA

  1. Has the building had its milestone inspection? What did phase one find, and was a phase two needed?
  2. Which repairs did the inspection recommend, and are they finished, under way or scheduled?
  3. When was the SIRS completed, and does this year's budget follow its funding schedule?
  4. Is the association pausing or reducing its reserve contributions?
  5. Has the board approved or discussed a special assessment, a loan or a line of credit?

Sources

  1. Florida Statutes section 553.899 (milestone inspections)
  2. Florida Statutes section 718.112(2)(c), (f) and (g) (notice of a special assessment; reserves; the structural integrity reserve study)
  3. Florida Statutes section 718.503(2) (what a seller gives a buyer, and the seven days to cancel)
  4. Fannie Mae Selling Guide B4-2.1-03, Ineligible Projects (critical repairs, special assessments, inspection reports)