How to read an HOA reserve study before you buy a condo

The warning about the next big repair is usually in the reserve study, somewhere in 60 pages or more. These are the six places to look, and what each one tells you.

Most condo buyers never read the reserve study. It's long, often 60 pages or more, and it usually arrives in a stack of HOA documents a few days before a deadline. But it's usually where the warning is: the roof due in two years, the elevator overhaul, the balcony repairs, and whether the association has saved enough to pay for them.

You don't have to read every page. Six places tell you most of what matters.

What a reserve study is

A reserve study is the association's long-range plan for the big, predictable repairs it pays for: roofs, paving, elevators, painting, pools, plumbing. A specialist lists each part, estimates how many years it has left and what replacing it will cost, then sets out how much the association should save each year, usually for the next 30 years.

Some states require one. California requires a visual inspection for the study at least every three years, and a review of the study every year, when the parts the association maintains are worth at least half its yearly budget. Florida requires a structural integrity reserve study (SIRS) at least every ten years for each condo building three habitable stories or taller. Many states require nothing, and plenty of associations have a study anyway. Ask for the most recent one. If there isn't one, that's worth knowing too.

1. The date, and what kind of study it is

Start with the cover or the first page. A study is a snapshot: prices and conditions change. Note when it was done and whether it was a full study with a site visit or an update done from the office. California's cycle is three years, and a lender who relies on a study instead of the budget test needs one completed within the last three years by an independent specialist. An older study can understate what the next repairs will cost.

2. Percent funded

Most studies print a "percent funded" figure: the reserves the association actually has, divided by what it should have by now given the age of everything (the "fully funded balance"). Reserve specialists commonly read it like this:

It's one number, so read it with the next two. A building at 70% with a new roof is in a very different place from one at 70% whose roof is due next year.

3. The 30-year funding plan table

Usually in the back half of the study: a table with a row for each year showing the contribution, the spending and the balance at year end. Scan the spending column for the big years in the next five, and the ending balance for any year where it drops close to zero or below.

From our fictional sample study, page 30 of 64: a $621,090 roof replacement in FY2027 takes the reserves from $640,400 down to $191,768.

A dip isn't a problem by itself if the plan was built for it. But many plans only work because contributions rise every year. The next place tells you whether that's actually happening.

4. The recommended contribution, against the budget

The study recommends how much to put into reserves this year. The association's budget shows what it actually set aside. Compare the two. If the budget is lower, the difference doesn't go away: it comes back later as higher dues, a special assessment or a loan.

While you have the budget open, check the lenders' test too: from January 4, 2027, Fannie Mae and Freddie Mac want at least 15% of the dues to go to reserves. Here's how to check it.

5. The plan's funding goal

Every funding plan aims at something, and the study says what:

  • Full funding aims to keep reserves at or near 100% funded.
  • Threshold funding keeps them above a set level, such as a percent funded or a dollar amount.
  • Baseline funding only keeps the balance above zero, so any cost overrun or surprise lands on the owners.

Lenders have noticed. For loan applications from August 3, 2026, a lender can't use a study's baseline plan to show that a condo's reserves are adequate (Fannie Mae and Freddie Mac).

6. What's past due, and what's left out

Look for parts the study marks as past due or deferred, and for anything it says it doesn't cover. In older buildings, the biggest bills often come from things like balconies, the structure or the plumbing inside walls. If the board minutes mention an engineer's report or a repair the study doesn't list, ask about it.

Then read the study with the other documents

  • The budget: what the association is actually saving this year. How to read the budget and the financial statements.
  • The latest financial statements: the real reserve balance, which can differ from the study's projection.
  • Board minutes from the past year: special assessments, loans and repairs being discussed.
  • Insurance: the deductibles, which owners may share after a loss.
  • In Florida: the SIRS and the milestone inspection report, if the building has one. What to check in each.

Questions to ask the HOA

  1. Has the board approved a special assessment, or is one being discussed?
  2. Does this year's budget fund the study's recommended reserve contribution? If not, why not?
  3. Are any repairs in the study past due or being put off?
  4. Is the association planning to borrow for any project?
  5. When is the next reserve study, and will it include a site visit?

Sources

  1. California Civil Code section 5550 (reserve study inspection every three years, reviewed every year)
  2. Florida Statutes section 718.112(2)(g) (the structural integrity reserve study)
  3. Association Reserves, How Much Reserves Should a Condo Have? (percent funded ranges)
  4. Association Reserves, Why Percent Funded Should Matter to You (0% to 30% weak, 30% to 70% fair, over 70% strong)
  5. Fannie Mae Selling Guide B4-2.2-01, Full Review Process (the 10% test; reserve studies within three years; no baseline)
  6. Freddie Mac, Condominium Unit Mortgage FAQ (baseline funding and reserve studies)
  7. Fannie Mae, Lender Letter LL-2026-03: Updates to Project Standards & Property Insurance Requirements (March 18, 2026)